| Last additions |

39 viewsMr ESep 04, 2009
|
|
|

int154 subframe71 viewsI used the C Channel on both side of the frame and them boxed the front so there connected with a solid fabrication. I also noticed that the welds were missing over the front axle support to the vertical plate connecting the two frames together R&L. BigBillSep 04, 2009
|
|

int154 FEL subframe65 views4" x 3" steel box beam
1/2" plate vertical across the bottom of the tractor tying together both the bases for the uprites for the lifting arms.BigBillSep 04, 2009
|
|

154 FEL subframe66 viewsHere's my design just off the top of my head. I'm just flying with an idea on how the structural should be fabricated.BigBillSep 04, 2009
|
|

int154 FEL225 viewsHere we go its the beginning of something great. Every part will be made by me except for the hydraulics. I left the drivetrain in the rolling frame so i know everything will clear on the final assembly. Measure twice cut/weld once.
Remember what my professor(PHD) taugh me the strength is in the vertical.BigBillSep 04, 2009
|
|
|
|
|
|
|
|

Cub 1 2009-09-0211 viewsgeibesSep 02, 2009
|
|

Geibes and Cub11 viewsgeibesSep 02, 2009
|
|

Cub-in-a-trailer13 viewsgeibesSep 02, 2009
|
|
|
|
|
|
|
|
|
| 27665 files on 1384 page(s) |
 |
 |
 |
 |
 |
 |
 |
776 |  |
 |
 |
 |
 |
|