Notice: Undefined offset: 8192 in /home/cubfest/public_html/photos/include/debugger.inc.php on line 112

Notice: Undefined offset: 8192 in /home/cubfest/public_html/photos/include/debugger.inc.php on line 112
FarmallCub | Cubfest Photo Gallery - Last additions/Almost Done-10

 FarmallCub | Cubfest Photo Gallery

Photo host for users of the FarmallCub.com forum
Home > User galleries > Rudi > Pole Barn Project

Almost Done-10
The foundation/grade line was sealed against moisture ingress. 45mm to 65mm salvaged rubber dam and salvaged tractor trailer or loader inner tubes were cut to size then stapled and nailed to the building and then buried about 12" deep around the entire building.

The ridge was sealed the same way so that no snow or rain etc., would leak into the new building or onto the old roof which leaked. Now it is dry and actually quite warm when the sun is shining. Lots of ventilation, but no openings for water.
Rate this file (current rating : 0 / 5 with 1 votes)
Rubbish
Poor
Fair
Good
Excellent
Great
File information
Filename:Almost_Done-10.jpg
Album name:Rudi / Pole Barn Project
Rating (1 votes):
File Size:50 KB
Date added:Nov 18, 2008
Dimensions:640 x 480 pixels
Displayed:137 times
URL:http://photos.cubfest.com/displayimage.php?pos=-14467
Favorites:Add to Favorites