Almost Done-10
|
The foundation/grade line was sealed against moisture ingress. 45mm to 65mm salvaged rubber dam and salvaged tractor trailer or loader inner tubes were cut to size then stapled and nailed to the building and then buried about 12" deep around the entire building.
The ridge was sealed the same way so that no snow or rain etc., would leak into the new building or onto the old roof which leaked. Now it is dry and actually quite warm when the sun is shining. Lots of ventilation, but no openings for water.
|
|